Product Details:
|
Surface Treatment: | Galvanized,Coated | Type: | Steel Coil,Steel Plate,coil Or Sheet,Roof Sheet,roofing Sheet |
---|---|---|---|
Width: | 600mm-1250mm,30mm To 1250mm,100mm~2500mm | Technique: | Hot Rolled/cold Rolled/galvanized Surface Treatment,Hot Dipped |
Grade: | SGCC,DX51D,SGCC/SGCH/SGHC/DX51D/CS-B,HDG,S355JR | Standard: | DIN,ASTM,GB,JIS,AISI |
Zinc Coating: | 30-600g/m2 | Thickness: | 0.12-4.5mm |
Spangle: | Reuglar Spangle,Minimized,Big Medium Small Zero,or No Spangle,Normal | Shape: | Wave,Plate,Sheet,Flat Steel Plate,Trapezoid/wave/glaze |
High Light: | 0.3mm 0.5mm Galvanized Steel Sheet,Hot Dip Galvanised Steel Plate,0.5mm Galvanised Steel Plate |
Thin Galvanized Steel Sheet 0.3mm 0.5mm Hot Dip Galvanized Steel Plate
Product Description
Product Details:
Normal spangle coating(NS),minimized spangle coating(MS),spangle-free(FS)
Product Parameter
Standard | astm a526 a528 a444, a653, jis g3302, en10142 en1012, etc |
Grade | DX51D+Z, DX52D+Z, DC52D+Z, DC51D+Z, S350GD+Z, G550, SGCC, DD52D+Z etc |
Thickness | 0.12-3.0mm (customize, above 3.0mm available) |
Width | 600-2000mm (customize) |
Length | as customer requirements |
Coil inner diameter | 508mm/610mm (customize) |
Zinc coating | 20-600g/m2 |
Raw material | cold rolled base. (hot rolled base also available) |
Technique | hot dipped. (electro also available) |
Coil weight | 3-8 tons |
Tolerance | thickness +- 0.02 or +- 0.04, width +-5mm |
Spangle type | zero spangle, small spangle, regular spangle, big spangle |
Surface treatment | chromated/non-chromated, oiled/non-oiled, anti-fingerprints |
Certification | CE, ISO9001-2008, SGS |
Monthly output | 17000 tons |
Packaging | 3 layers. kraft paper outside + water-proof plastic film in the middle + steel plate covered with strips outside |
Landing port | qingdao/shanghai/tianjin port |
Payment terms | T/T, L/C, western union paypal etc |
Delivery time | it takes about 10 days for stock goods, or it will need 15-25 days if goods need to be customized |
MOQ | as customer needs. reminder: more quantity reduce your purchase cost greatly |
Application
1. Fence, greenhouse, door pipe,greenhouse
2. Low pressure liquid, water, gas, oil, line pipe
3. For both indoor and outdoor the building construction
4. Widely used in scaffolding construction which is much cheaper and convenient
Packing and Transportation
FAQ
Q1:What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery.
Q2: What is the terms of trade?
A: EXW, FOB, CIF, CFR, DDU.
Q3: What is the terms of packing?
A: Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers'
requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after received your deposit. For productiong period, it
usually takes about 15-30 days afer receiving the deposit.
Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Contact Person: JK