Product Details:
|
Grade: | BS 1139 | Technique: | Hot Rolled |
---|---|---|---|
Product Name: | Seamless Steel Pipe | Grade Group: | Q195-Q345 |
Application: | Structure Pipe | Standard: | ASTM,BS |
Secondary Or Not: | Non-secondary | Surface: | Customers't Requirement |
High Light: | 48.3mm ERW Carbon Steel Pipe,Hot Dipped Galvanised Scaffold Tube,48.3mm Galvanised Scaffold Tube |
Hot-dipped Q345 Galvanized Scaffold Steel Pipe 48.3mm ERW Welded MS Low Carbon GI Pipe for Construction
Product Description
Galvanised scaffold tube is also called galvanized scaffolding pipe. The diameter of a scaffold tube is OD48.3mm. While the thickness of galvanised scaffold tubes is 3.2mm or 4.0mm.
Product Details
Product Parameter
Outside Diameter | 1-1/2"(48.3MM,48.6MM) |
Wall Thickness | 2.1-2.3MM,2.9-3.2MM,3.6-4.0MM |
Length | 0.3-12M,according to customer requirements |
Materials | Q235,Q345,S355,S235GT,STK400,STK500 |
Standard | BS1139,EN39,JIS G3444,GB/T3091-2001 |
Tolerance | +/-1% |
Surface Treatment | Hot Dip Galvanized |
Zinc Coating | 30-60 microns |
Technique | ERW(Electronic Resistance Welded) |
Certification | ISO9001:2015,CE |
Package | Packing in bundle by steel strip |
Loading Port | Port of Tianjin,China |
Capacity | 4500 tons per month |
Delivery Time | 15-20 days after receipt of deposit |
Main Market | Southeast Asia,UK,Middle East,Africa,South America etc |
Product Application
Product Packing
Advantages of steel pipe
1.durable & stable
2.good bearing capacity
3.low cost, high quality
4.Excellent security function
5.easy to assemble & dismantle
6.long durability, the working life can up to 5-8 years
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight
FAQ
Q1:Can we supply the sample ? |
A:Yes,we can supply the sample.You can tell us the detailed size. |
Q2:Can we accept customize? |
A:Yes,we can.We can manufacture as customer's requirement.You can send the CAD or drawing to us. |
Q3:Quality problem? |
A:According to the standard for production.And the products must pass the quality inspection department. We also accept Third Part Inspection. |
Q4:Delivery time? |
A:Prompt delivery for standard size,or under the contract. |
Q5:Payment term? |
A:Under the contract. |
Q6:Other problem? |
A:You can contact our customer service staff to ask help. |
Contact Person: JK